Notes on parametric settlement
Index sources, trigger definitions and what happens after a qualifying event.
Field notes: the renewal where the swath edge cut the box in halfA renewal-season note on what happens when a cat-in-a-box trigger geometry lands right on a wide-swath coverage seam instead of inside it.
What is a qualifying event in a parametric trigger contractWhat counts as a qualifying event in a parametric trigger, and why satellite confirmation matters when a payout is on the line.
Optical vs SAR for a wildfire trigger: which imagery settles the payoutOptical and SAR each read a burn scar differently. Here's what that means for a parametric wildfire trigger, and why cloud cover still matters.
What counts as an independent observer in a parametric contractA plain look at what "independent observer" actually means in a parametric trigger clause, and why the source of the read matters as much as the number.
Field notes: the earthquake that triggered two contracts on two different clocksA single quake, two parametric covers, two trigger clocks: one ground-station PGA read, one bulletin-based index, and the 36 hours between them.
Modeled loss, indemnity, and parametric triggers: how verification differsA breakdown of indemnity, modeled loss, and parametric triggers in cat bonds, and why only one type needs an independent observation to settle.
How to verify a parametric earthquake trigger with before and after satellite imageryA practical walkthrough of using pre- and post-event satellite passes to confirm an earthquake parametric trigger, independent of either side's numbers.
What is an attachment point in a parametric contract?What an attachment point means in a parametric contract, how it differs from an exit point, and how sponsors set one.
How many satellite passes confirm a parametric trigger event?Why "how many passes" is the wrong question for a parametric trigger, and what cloud cover and revisit cadence mean for settlement timing.
What is a peril footprint in a parametric contract?A plain explanation of peril footprint in parametric insurance, how it's measured, and why an independent before/after read matters at settlement.
How long after a cyclone does satellite imagery confirm a parametric trigger?A realistic timeline for post-cyclone imagery confirmation of a parametric trigger, from satellite tasking through cloud clearing to the before/after read.
What to do when a parametric index and ground reports disagreeA field team reports damage the index didn't register. Here's how to build a dispute file that moves a parametric settlement.
Single ground station vs. satellite read: confirming a parametric triggerA ground station can go dark at the worst moment. Here's how a satellite read of the peril footprint compares for settling a parametric trigger.
What is a reporting agent in a parametric insurance contract?A plain look at the reporting agent role in parametric contracts: what they do, who appoints them, and why independence matters at payout.